FGL-BIM-PROP-002, Rev 01 · Solo, part-time, remote consultant · Market: UAE · Currency: AED (ex-VAT) · Validity 45 days

<aside> 🔴

Rev 01 supersedes Rev 00 entirely. Rev 00 priced a full consultancy in USD — $179,255 year-1, BIMC credits at $125/hr, a five-track curriculum and staffed day rates. None of that model is live. Rev 01 is what is actually being sold: one person, part-time, remote, in AED.

</aside>

<aside> ⚠️

Before issuing: replace [Client Firm Name], [Name, Title] and [DD Month 2026]. The issued artefacts are BIM_Consultancy_Proposal.docx and the companion BIM_Training_Program.docx.

</aside>


1. The offer — three independent lines

Buy what you need. Nothing is bundled.

Line What it is Price
A — Setup package A one-time engagement that produces your BIM standards, templates and start-up guide. AED 15,000 one-time
B — Support retainer Ongoing advisory. Three working days a week of availability, all year. AED 7,000 / month
C — Training modules 36 modules across six tracks. Each staff member attends only the modules their role requires. From AED 200 / person

The shape of the argument. Most firms are sold a single large programme, pay once, and watch the standards decay within a year. The documents were never the problem — the absence of anyone to defend them was. The setup package is deliberately small and finite; it ends. The retainer is what actually changes the firm: it is the cheapest line here and the one that decides whether the other two were worth buying.

The comparison the finance director will make. A full-time BIM Manager in this market costs upward of AED 200,000 a year, plus recruitment, visa and the risk the person leaves. Setup plus a full year of retainer is AED 99,000 — no hiring risk, no notice period.


2. Setup — AED 15,000, 10 weeks, four work packages

Delivered remotely. Four artefacts, each with a defined acceptance test. When the fourth is signed off, setup is finished and the retainer takes over.

Ref Work package When Fee
WP1 Discovery and current-state audit Weeks 1–2 AED 3,000
WP2 BIM Execution Plan (BS EN ISO 19650-2) Weeks 3–6 AED 5,500
WP3 LOIN matrix, CDE rules, naming convention Weeks 6–8 AED 4,000
WP4 Revit template and project start-up guide Weeks 9–10 AED 2,500
Total 10 weeks AED 15,000

3. Support — the monthly retainer

Fee Availability Term Notice
AED 7,000 / month Three working days a week Rolling, minimum 3 months One month, either side